Traffic & Reliability
0.40–0.50 typical
e.g. 4.2 − 2.5 = 1.7
Layer Coefficients & Drainage
0 to skip
Results
Z_R
-1.645
SN required
4.79
SN provided
5.46
log₁₀ W18 (predicted)
7.103
Asphalt (D₁)
165 mm
Contribution SN = 2.86
Base (D₂)
355 mm
Contribution SN = 1.96
Subbase (D₃)
150 mm
Contribution SN = 0.65